30 Days

To Completion

 

Day 1-5    Preparing the site, digging out the dirt.

 

Day 6-8   Pouring slab foundation, installing exterior wall panels with steel framing.

 

Day 9-12    Steel framing interior walls and roof panels.

 

Day 13   Install Building Trim

 

Day 14-15    Galvalume Steel Roof Installation

 

Day 16-17    Sheetrock and tape float interior walls.

 

Day 18-20    Installing and finishing the brick veneer.

 

The Driveway    Pouring and setting the driveway and sidewalk. One day.

 

Paint & Trim    Installing the molding, trim and painting the inside.

 

Custom Cabinets   Installing custom cabinets in the kitchen and bathrooms.